Facility requirements
Review electricity consumption, load profiles, operating hours and site conditions.
A power purchase agreement (PPA) defines how capital, ownership, operations and electricity purchases are structured. 365Energy connects engineering, commercial planning and delivery to suit each facility.
A PPA can separate the decision to use electricity from the decision to own the assets. The facility purchases electricity under a contract, while investment and operating responsibilities follow the project structure.
Review electricity consumption, load profiles, operating hours and site conditions.
Define investment principles, ownership, responsibilities and electricity purchase terms for the project.
The system supplies electricity to the facility. Consumption and payment follow the agreed arrangements.
Suitability depends on electricity demand, site conditions, the planned period of use, capital priorities and energy goals.
Is there enough information on consumption, load profiles and operating hours to assess the options?
Are the roof or available space, structural conditions and technical constraints suitable for further assessment?
Do site-use rights and operating plans support a long-term contract structure?
How does the business want to balance upfront investment, cash flow, ownership and control?
Which electricity cost, renewable energy and ESG requirements should take priority?
The main differences between EPC, EPC-F and PPA are capital investment, ownership, control of the assets and operating responsibilities.
This is a comparison of the models in general terms. Specific terms must be confirmed for each commercial proposal and contract.
Before agreeing on a proposal, clarify who provides the data, who invests, who owns the assets and who handles engineering and operations.
| SCOPE | FACILITY | INVESTOR / PPA PARTNER | 365Energy |
|---|---|---|---|
| Load & site data | Provide inputs | — | Review |
| Technical assessment | Coordinate | — | Within the project scope |
| Engineering design | Coordinate | Under the project structure | Within the project scope |
| Project investment | Under the proposed arrangement | Under the contract | Within the confirmed scope |
| Asset ownership | Under the contract | Under the contract | Within the confirmed scope |
| Operations, maintenance & monitoring | Coordinate | Under the contract | Within the agreed scope |
The process moves from initial data to feasibility assessment, commercial structuring, contracting, delivery and operations.
Electricity bills, load profiles, site information and operating conditions.
Technical feasibility, the basis for system sizing and key technical constraints.
Investment arrangements, PPA principles and allocation of responsibilities.
Agree on the scope, terms and requirements before implementation.
Design, procurement, construction, QA/QC, testing and acceptance.
Monitoring, O&M and reporting within the agreed scope.
Each stage needs a clear checkpoint to reduce gaps between commercial decisions and technical execution.
Each checkpoint clarifies inputs, scope and responsibilities before the project moves to the next stage.
Clarify load data, site conditions and technical assumptions before structuring the proposal.
Define ownership, responsibilities, payment arrangements and contract conditions for each project.
Manage design, QA/QC, testing and acceptance within the agreed delivery scope.
Link monitoring, O&M and reporting to operating responsibilities once the project is in service.
The information below is general. Specific terms must be confirmed against the project, contract and applicable regulations.
On this page, PPA refers to an on-site project model. DPPA is a direct power purchase mechanism between renewable energy generators and large electricity users under Decree 57/2025/ND-CP, as amended by Decree 243/2026/ND-CP. Whether a project falls under or needs to use the DPPA mechanism must be reviewed against its connection model, participating parties and the regulations in force at the time of assessment.
There is no single price that should be assumed for every facility. An assessment needs to consider technical conditions, investment structure, contract duration, operating scope and allocation of responsibilities.
The contract term is part of the commercial structure. It needs to be assessed alongside site-use conditions, investment arrangements, project economics and the parties’ long-term responsibilities.
End-of-term arrangements depend on the agreed terms and the project’s ownership structure. Asset transfer should not be assumed unless it is specified in the contract.
Changes in demand can affect system sizing, self-consumption and the commercial viability of the proposal. Current data and planned operational changes should therefore be considered from the outset.
Depending on the available data and the initial assessment scope, 365Energy focuses on four outputs to help the business decide its next step.
Key technical conditions and constraints to confirm before proceeding further.
An initial approach to investment structure, electricity purchases and the assumptions that need testing.
The parties and responsibilities to clarify in the next project stage.
Missing information required to continue the technical and commercial assessment.
Every facility has a different load profile, site conditions and investment goals. Share your initial information so 365Energy can identify the data needed for the next assessment stage.