Establish the technical basis
Assess load profile, roof conditions, grid connection and operating requirements before selecting the configuration.
365Energy starts with load profile, electricity cost, power reliability and operating conditions to define the technical solution, investment model and delivery scope for each facility.
365Energy organizes solutions across four delivery areas: Technical Delivery, Financial Structuring, Performance Management, and ESG & Green Transition. Solar PV, BESS, EMS, Power Quality and Energy Efficiency are modules selected according to each facility’s needs; they are not automatically included in every project.
Discuss your energy requirementsEPC, EPC-F and PPA differ in upfront investment, ownership, level of control and allocation of responsibilities. The appropriate model depends on financial objectives, asset-ownership preferences and project-specific conditions.
Suitable when the company prioritizes asset ownership and can allocate upfront investment.
365Energy coordinates design, permitting, HSE, QA/QC, construction, testing and acceptance through one accountable interface. Key risks, impacts and control measures are reviewed before and during project delivery.
Assess load profile, roof conditions, grid connection and operating requirements before selecting the configuration.
Define accountable interfaces, control milestones and coordination with the facility across design, procurement and construction.
Agree the testing scope, handover documentation and post-acceptance operating requirements.
After commercial operation (COD), the objective extends beyond equipment maintenance to performance monitoring, reduced downtime and protection of long-term asset value.
The projects below show different 365Energy capability scopes, from BESS integration and design for wind conditions to safety requirements and large-scale system design.
Vilube – Motul Vietnam

Integrate Solar PV and BESS within an operating manufacturing facility.
Design and deliver a 284.35 kWp Solar PV system integrated with a 215 kWh BESS under an EPC scope.
Integration of on-site generation and storage within one industrial energy architecture.

Share your facility’s needs and basic information so we can identify an appropriate assessment path. Technical documents and detailed data can be provided after the initial discussion.