{"id":8479,"date":"2021-11-05T11:22:23","date_gmt":"2021-11-05T04:22:23","guid":{"rendered":"https:\/\/365energy.vn\/esco-solar-power-solutions-new-investment-direction-for-businesses\/"},"modified":"2026-11-04T21:22:13","modified_gmt":"2026-11-04T14:22:13","slug":"esco-solar-power-solutions-new-investment-direction-for-businesses","status":"publish","type":"post","link":"https:\/\/365energy.vn\/en\/esco-solar-power-solutions-new-investment-direction-for-businesses\/","title":{"rendered":"Rooftop solar and ESCOs: What should a business assess?"},"content":{"rendered":"<p>When considering rooftop solar, a business needs to assess electricity costs, investment capital and operating responsibilities together. Working with an energy service provider can offer different ways to allocate funding and work. The value of each arrangement depends on facility data and contract terms.<\/p>\n<h2>What is an ESCO\u2019s role in an energy project?<\/h2>\n<p>ESCO stands for <em>Energy Service Company<\/em>. Its services can include assessment, design, implementation, arranging finance and monitoring performance, as agreed. In a performance-based agreement, the parties need to establish how results will be measured and verified, and who is responsible if performance differs from the agreed level.<\/p>\n<p>For a solar project funded by a third party, the business should identify who owns the system, who buys the electricity, who operates it and how payments work. These roles are defined in the agreement for the project.<\/p>\n<figure class=\"wp-caption aligncenter\" style=\"max-width:100%;width:1100px\">\n<img class=\"wp-image-4483 size-full\" src=\"https:\/\/365energy.vn\/wp-content\/uploads\/2021\/10\/Giai-phap-Dien-mat-troi-ESCO.jpg\" alt=\"Illustration of the parties in a solar arrangement involving a financial partner\" width=\"1100\" height=\"700\" loading=\"lazy\" decoding=\"async\" title=\"\" srcset=\"https:\/\/365energy.vn\/wp-content\/uploads\/2021\/10\/Giai-phap-Dien-mat-troi-ESCO.jpg 1100w, https:\/\/365energy.vn\/wp-content\/uploads\/2021\/10\/Giai-phap-Dien-mat-troi-ESCO-300x191.jpg 300w, https:\/\/365energy.vn\/wp-content\/uploads\/2021\/10\/Giai-phap-Dien-mat-troi-ESCO-1024x652.jpg 1024w, https:\/\/365energy.vn\/wp-content\/uploads\/2021\/10\/Giai-phap-Dien-mat-troi-ESCO-768x489.jpg 768w, https:\/\/365energy.vn\/wp-content\/uploads\/2021\/10\/Giai-phap-Dien-mat-troi-ESCO-600x382.jpg 600w\" sizes=\"auto, (max-width: 1100px) 100vw, 1100px\" \/><figcaption class=\"wp-caption-text\">Illustration of one arrangement involving a customer, financial partner and delivery provider. Actual scope and responsibilities are defined in the contract.<\/figcaption><\/figure>\n<p class=\"e365-artwork-translation\"><strong>English guide to the original diagram:<\/strong> \u201cCh\u1ee7 \u0111\u1ea7u t\u01b0\u201d means investor and \u201cDoanh nghi\u1ec7p\u201d means business customer. The parties\u2019 funding, ownership and operating responsibilities depend on the project agreement.<\/p>\n<h2>What should a business clarify before choosing an arrangement?<\/h2>\n<h3>Funding, ownership and payment obligations<\/h3>\n<p>Identify the investor, the costs the customer must cover, roof access rights and asset ownership at each stage. Third-party funding should be assessed alongside the customer\u2019s remaining obligations, including payments, site access and arrangements at contract expiry.<\/p>\n<h3>Pricing and the basis for assessing costs<\/h3>\n<p>Clarify electricity charges or service fees, adjustment mechanisms, duration and payment terms. Compare options using consistent assumptions for load, expected generation, self-consumption and costs over the evaluation period. Any savings figure needs to be calculated from project data and the proposed terms.<\/p>\n<h3>Design, operations and incident response<\/h3>\n<p>Review the roof, existing electrical system, connection conditions and effects on production. The agreement should identify who maintains, insures and monitors the system, handles incidents and reports results. Performance targets or guarantees need a measurement method, applicable conditions and corresponding responsibilities.<\/p>\n<h3>Asset transfer and energy attributes<\/h3>\n<p>Clarify renewal, termination, purchase and transfer terms. If the business intends to report renewable electricity use or emissions, establish ownership of energy attributes and the evidence it is entitled to use.<\/p>\n<h2>Start with facility information<\/h2>\n<p>Prepare electricity consumption data, operating schedules, roof and electrical system information, and investment and operating objectives. These inputs support a comparison of direct investment and third-party arrangements on a consistent basis.<\/p>\n<p>365Energy can help define the input data and scope of technical and commercial assessment appropriate to the project.<\/p>\n<p><a href=\"https:\/\/365energy.vn\/en\/contact\/\">Discuss investment options for your facility<\/a> or <a href=\"https:\/\/365energy.vn\/en\/ppa\/\">review the points to clarify in a PPA arrangement<\/a>.<\/p>\n<h2>References<\/h2>\n<ul>\n<li><a href=\"https:\/\/www.energy.gov\/cmei\/femp\/energy-service-companies-0\" target=\"_blank\" rel=\"noopener nofollow\">U.S. Department of Energy \u2014 Energy Service Companies<\/a><\/li>\n<li><a href=\"https:\/\/www.epa.gov\/statelocalenergy\/customer-power-purchase-agreements\" target=\"_blank\" rel=\"noopener nofollow\">U.S. EPA \u2014 Customer Power Purchase Agreements<\/a><\/li>\n<\/ul>\n<p><em>These international references explain concepts and the allocation of responsibilities. Implementation in Vietnam requires a review of the project, agreement and applicable requirements.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>What to clarify when assessing rooftop solar with an energy service provider: funding, pricing, ownership and responsibilities under the agreement.<\/p>\n","protected":false},"author":2,"featured_media":8485,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[268,36],"tags":[],"class_list":["post-8479","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-experiences","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/365energy.vn\/en\/wp-json\/wp\/v2\/posts\/8479","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/365energy.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/365energy.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/365energy.vn\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/365energy.vn\/en\/wp-json\/wp\/v2\/comments?post=8479"}],"version-history":[{"count":5,"href":"https:\/\/365energy.vn\/en\/wp-json\/wp\/v2\/posts\/8479\/revisions"}],"predecessor-version":[{"id":13244,"href":"https:\/\/365energy.vn\/en\/wp-json\/wp\/v2\/posts\/8479\/revisions\/13244"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/365energy.vn\/en\/wp-json\/wp\/v2\/media\/8485"}],"wp:attachment":[{"href":"https:\/\/365energy.vn\/en\/wp-json\/wp\/v2\/media?parent=8479"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/365energy.vn\/en\/wp-json\/wp\/v2\/categories?post=8479"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/365energy.vn\/en\/wp-json\/wp\/v2\/tags?post=8479"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}