{"id":7314,"date":"2022-10-11T16:44:05","date_gmt":"2022-10-11T09:44:05","guid":{"rendered":"https:\/\/365energy.vn\/commencement-ceremony-of-bat-vinataba-rooftop-solar-project\/"},"modified":"2026-10-12T09:28:50","modified_gmt":"2026-10-12T02:28:50","slug":"commencement-ceremony-of-bat-vinataba-rooftop-solar-project","status":"publish","type":"post","link":"https:\/\/365energy.vn\/en\/commencement-ceremony-of-bat-vinataba-rooftop-solar-project\/","title":{"rendered":"Commencement ceremony of BAT &#8211; VINATABA Rooftop Solar Project"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">The solar power project at BAT &#8211; VINATABA factory was started on December 15, 2021 by <a title=\"365 Energy\" href=\"https:\/\/365energy.vn\/en\/\" target=\"_blank\" rel=\"noopener\"><span style=\"color: #99cc00;\">365 Energy<\/span><\/a> as the general contractor for construction and installation and Vietnam Solar Power Utility Company (BECIS VN) as the investor.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Total project capacity of 1001.52 KWP which generates annual power output about 1,398,397 kWh\/year to supply power to the plant.<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-5143\" src=\"https:\/\/365energy.vn\/wp-content\/uploads\/2021\/12\/Le-khoi-cong-du-an-BAT-VINATABA-scaled.jpg\" alt=\"L\u1ec5 kh\u1edfi c\u00f4ng d\u1ef1 \u00e1n BAT VINATABA\" width=\"2560\" height=\"1873\" title=\"\" srcset=\"https:\/\/365energy.vn\/wp-content\/uploads\/2021\/12\/Le-khoi-cong-du-an-BAT-VINATABA-scaled.jpg 2560w, https:\/\/365energy.vn\/wp-content\/uploads\/2021\/12\/Le-khoi-cong-du-an-BAT-VINATABA-300x219.jpg 300w, https:\/\/365energy.vn\/wp-content\/uploads\/2021\/12\/Le-khoi-cong-du-an-BAT-VINATABA-1024x749.jpg 1024w, https:\/\/365energy.vn\/wp-content\/uploads\/2021\/12\/Le-khoi-cong-du-an-BAT-VINATABA-768x562.jpg 768w, https:\/\/365energy.vn\/wp-content\/uploads\/2021\/12\/Le-khoi-cong-du-an-BAT-VINATABA-1536x1124.jpg 1536w, https:\/\/365energy.vn\/wp-content\/uploads\/2021\/12\/Le-khoi-cong-du-an-BAT-VINATABA-2048x1498.jpg 2048w, https:\/\/365energy.vn\/wp-content\/uploads\/2021\/12\/Le-khoi-cong-du-an-BAT-VINATABA-600x439.jpg 600w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><\/p>\n<p><span style=\"font-weight: 400;\">The conversion efficiency of the system is stable thanks to the use of <\/span><b>1872 JA 535W panels<\/b><span style=\"font-weight: 400;\"> and <\/span><b>8 inverters SMA 110kW<\/b><span style=\"font-weight: 400;\"> to ensure high conversion capacity.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The system design includes calculation of the load to ensure the power output is enough for the needs of the plant. Incorporating <span style=\"color: #99cc00;\">zero export technology<\/span> which prevents excess power generation on the grid (on off days, holidays, &#8230;) and ensures not overloading the grid.<\/span><\/p>\n<figure id=\"attachment_5149\" aria-describedby=\"caption-attachment-5149\" style=\"width: 2500px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"M\u00f4 ph\u1ecfng h\u1ec7 th\u1ed1ng d\u1ef1 \u00e1n wp-image-5148 size-full\" title=\"M\u00f4 ph\u1ecfng h\u1ec7 th\u1ed1ng d\u1ef1 \u00e1n\" src=\"https:\/\/365energy.vn\/wp-content\/uploads\/2021\/12\/Mo-phong-du-an.jpg\" alt=\"M\u00f4 ph\u1ecfng h\u1ec7 th\u1ed1ng d\u1ef1 \u00e1n\" width=\"2500\" height=\"1406\" srcset=\"https:\/\/365energy.vn\/wp-content\/uploads\/2021\/12\/Mo-phong-du-an.jpg 2500w, https:\/\/365energy.vn\/wp-content\/uploads\/2021\/12\/Mo-phong-du-an-300x169.jpg 300w, https:\/\/365energy.vn\/wp-content\/uploads\/2021\/12\/Mo-phong-du-an-1024x576.jpg 1024w, https:\/\/365energy.vn\/wp-content\/uploads\/2021\/12\/Mo-phong-du-an-768x432.jpg 768w, https:\/\/365energy.vn\/wp-content\/uploads\/2021\/12\/Mo-phong-du-an-1536x864.jpg 1536w, https:\/\/365energy.vn\/wp-content\/uploads\/2021\/12\/Mo-phong-du-an-2048x1152.jpg 2048w, https:\/\/365energy.vn\/wp-content\/uploads\/2021\/12\/Mo-phong-du-an-600x337.jpg 600w\" sizes=\"auto, (max-width: 2500px) 100vw, 2500px\" \/><figcaption id=\"caption-attachment-5149\" class=\"wp-caption-text\">(Simulation image of the project&#8217;s solar power system)<\/figcaption><\/figure>\n<p><span style=\"font-weight: 400;\">This solar power project is invested under the <span style=\"color: #99cc00;\">ESCO<\/span> model to help businesses take advantage of the available roof but still ensure benefits from solar power without having to invest in construction and operation.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">It is expected that the project will be completed and put into use on January 28, 2022, providing electricity for the manufacturing plant, helping to reduce 1461.46 tons of CO2 emissions annually, contributing to environmental protection, and keeping up with the global trend: clean energy &#8211; renewable energy.<\/span><\/p>\n<figure id=\"attachment_5153\" aria-describedby=\"caption-attachment-5153\" style=\"width: 2560px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-5152\" src=\"https:\/\/365energy.vn\/wp-content\/uploads\/2021\/12\/Khoi-cong-du-an-BAT-Vinataba-scaled.jpg\" alt=\"Kh\u1edfi c\u00f4ng d\u1ef1 \u00e1n BAT - Vinataba\" width=\"2560\" height=\"1707\" title=\"\" srcset=\"https:\/\/365energy.vn\/wp-content\/uploads\/2021\/12\/Khoi-cong-du-an-BAT-Vinataba-scaled.jpg 2560w, https:\/\/365energy.vn\/wp-content\/uploads\/2021\/12\/Khoi-cong-du-an-BAT-Vinataba-300x200.jpg 300w, https:\/\/365energy.vn\/wp-content\/uploads\/2021\/12\/Khoi-cong-du-an-BAT-Vinataba-1024x683.jpg 1024w, https:\/\/365energy.vn\/wp-content\/uploads\/2021\/12\/Khoi-cong-du-an-BAT-Vinataba-768x512.jpg 768w, https:\/\/365energy.vn\/wp-content\/uploads\/2021\/12\/Khoi-cong-du-an-BAT-Vinataba-1536x1024.jpg 1536w, https:\/\/365energy.vn\/wp-content\/uploads\/2021\/12\/Khoi-cong-du-an-BAT-Vinataba-2048x1365.jpg 2048w, https:\/\/365energy.vn\/wp-content\/uploads\/2021\/12\/Khoi-cong-du-an-BAT-Vinataba-600x400.jpg 600w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><figcaption id=\"caption-attachment-5153\" class=\"wp-caption-text\">Kh\u1edfi c\u00f4ng d\u1ef1 \u00e1n BAT &#8211; Vinataba<\/figcaption><\/figure>\n<p><strong>Xem th\u00eam:<\/strong><\/p>\n<ul>\n<li><a title=\"T\u1eadn d\u1ee5ng m\u00e1i x\u01b0\u1edfng \u2013 t\u1eadn h\u01b0\u1edfng l\u1ee3i \u00edch t\u1eeb h\u1ec7 th\u1ed1ng \u0110i\u1ec7n m\u1eb7t tr\u1eddi\" href=\"https:\/\/365energy.vn\/tan-dung-mai-xuong-tan-huong-loi-ich-tu-he-thong-dien-mat-troi\/\" target=\"_blank\" rel=\"noopener\"><span style=\"color: #99cc00;\">T\u1eadn d\u1ee5ng m\u00e1i x\u01b0\u1edfng \u2013 t\u1eadn h\u01b0\u1edfng l\u1ee3i \u00edch t\u1eeb h\u1ec7 th\u1ed1ng \u0110i\u1ec7n m\u1eb7t tr\u1eddi<\/span><\/a><\/li>\n<li><span style=\"color: #99cc00;\">Vi\u1ec7t Nam cam k\u1ebft kh\u00f4ng t\u0103ng nhi\u1ec7t \u0111i\u1ec7n than<\/span><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>The solar power project at BAT &#8211; VINATABA factory was started on December 15, 2021 by 365 Energy as the&#8230;<\/p>\n","protected":false},"author":2,"featured_media":5139,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[36,267],"tags":[],"class_list":["post-7314","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-project-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/365energy.vn\/en\/wp-json\/wp\/v2\/posts\/7314","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/365energy.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/365energy.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/365energy.vn\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/365energy.vn\/en\/wp-json\/wp\/v2\/comments?post=7314"}],"version-history":[{"count":4,"href":"https:\/\/365energy.vn\/en\/wp-json\/wp\/v2\/posts\/7314\/revisions"}],"predecessor-version":[{"id":12991,"href":"https:\/\/365energy.vn\/en\/wp-json\/wp\/v2\/posts\/7314\/revisions\/12991"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/365energy.vn\/en\/wp-json\/wp\/v2\/media\/5139"}],"wp:attachment":[{"href":"https:\/\/365energy.vn\/en\/wp-json\/wp\/v2\/media?parent=7314"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/365energy.vn\/en\/wp-json\/wp\/v2\/categories?post=7314"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/365energy.vn\/en\/wp-json\/wp\/v2\/tags?post=7314"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}