{"id":11717,"date":"2026-09-22T16:32:41","date_gmt":"2026-09-22T09:32:41","guid":{"rendered":"https:\/\/365energy.vn\/tong-thau-epcc\/"},"modified":"2026-11-06T09:03:14","modified_gmt":"2026-11-06T02:03:14","slug":"epcc-contractor","status":"publish","type":"page","link":"https:\/\/365energy.vn\/en\/epcc-contractor\/","title":{"rendered":"365E &#8211; Industrial Solar EPCC"},"content":{"rendered":"<p><main class=\"energy365-epcc e365-site\" data-asset-base=\"\/wp-content\/themes\/flatsome-child\/assets\/365e-unified\/epcc\/images\/\" data-e365-page=\"EPCC\" lang=\"en\" data-epcc-lang=\"en\" data-e365-lang=\"en\"><\/p>\n<section aria-labelledby=\"epcc-h1\" class=\"energy365-epcc-hero\" id=\"epcc-top\">\n<div class=\"energy365-epcc-shell\">\n<div class=\"epcc-hero-editorial\">\n<div class=\"epcc-hero-editorial__intro\">\n<div class=\"epcc-hero-editorial__heading\"><span>TECHNICAL DELIVERY \u00b7 EPCC<\/span><\/p>\n<h1 id=\"epcc-h1\">Industrial Solar EPCC<\/h1>\n<\/div>\n<div class=\"epcc-hero-editorial__copy\">\n<p>One accountable delivery partner connects site assessment, engineering, procurement, construction and commissioning, helping industrial facilities reduce coordination risk through handover.<\/p>\n<div class=\"epcc-hero-editorial__actions\"><a class=\"epcc-hero-editorial__primary\" data-e365-cta=\"consultation\" data-epcc-event=\"epcc_primary_cta_click\" href=\"https:\/\/365energy.vn\/en\/contact\/?solution=epcc\">Request a technical consultation \u2192<\/a><a class=\"epcc-hero-editorial__secondary\" data-epcc-event=\"epcc_scope_cta_click\" href=\"#epcc-scope\">Explore the delivery scope <span aria-hidden=\"true\">\u2193<\/span><\/a><\/div>\n<p class=\"e365-source-note\">EPCC is one delivery scope within <a data-e365-route=\"Solution\" href=\"\/en\/integrated-energy-solutions\/\">365Energy\u2019s integrated energy solutions<\/a>.<\/p>\n<\/div>\n<\/div>\n<figure class=\"epcc-hero-editorial__image\"><img decoding=\"async\" alt=\"Aerial view of an industrial facility with rooftop solar PV\" fetchpriority=\"high\" height=\"673\" src=\"\/wp-content\/themes\/flatsome-child\/assets\/365e-unified\/epcc\/images\/hero-factory.webp\" width=\"1198\" title=\"\"><figcaption>\n<div><span>ROOFTOP SOLAR PV<\/span><strong>Configured for each facility<\/strong><\/div>\n<\/figcaption><\/figure>\n<\/div>\n<p><!-- DYNAMIC PROOF: verify 250+\/200+\/70+\/50+ with BD + Project + O&M before each production publish. --><\/p>\n<div aria-label=\"365Energy capabilities\" class=\"energy365-epcc-proof energy365-epcc-reveal\">\n<div>\n<div class=\"energy365-epcc-proof__metric\"><strong data-count=\"250\" data-suffix=\"+\">250+<\/strong><span class=\"energy365-epcc-proof__unit\">MWp<\/span><\/div>\n<p><small>Rooftop solar PV capacity<\/small><\/div>\n<div>\n<div class=\"energy365-epcc-proof__metric\"><strong data-count=\"200\" data-suffix=\"+\">200+<\/strong><\/div>\n<p><small>C&amp;I projects<\/small><\/div>\n<div>\n<div class=\"energy365-epcc-proof__metric\"><strong data-count=\"70\" data-suffix=\"+\">70+<\/strong><\/div>\n<p><small>In-house workforce<\/small><\/div>\n<div>\n<div class=\"energy365-epcc-proof__metric\"><strong data-count=\"50\" data-suffix=\"+\">50+<\/strong><span class=\"energy365-epcc-proof__unit\">MWp<\/span><\/div>\n<p><small>O&amp;M portfolio<\/small><\/div>\n<\/div>\n<p class=\"e365-source-note epcc-proof-source\">Company-wide capabilities based on the 2026 company profile, covering multiple service scopes; not all are EPCC projects.<\/p>\n<\/div>\n<\/section>\n<nav aria-label=\"Page navigation\" class=\"e365-journey\">\n<div class=\"e365-journey__inner\">\n<div class=\"e365-journey__track\"><a href=\"#epcc-problem\"><b>01<\/b><span>Challenges<\/span><\/a><a href=\"#epcc-scope\"><b>02<\/b><span>Scope<\/span><\/a><a href=\"#epcc-control\"><b>03<\/b><span>Quality<\/span><\/a><a href=\"#epcc-risk\"><b>04<\/b><span>Risks<\/span><\/a><a href=\"#epcc-capability\"><b>05<\/b><span>Capability<\/span><\/a><a href=\"#epcc-projects\"><b>06<\/b><span>Projects<\/span><\/a><a href=\"#epcc-faq\"><b>07<\/b><span>FAQ<\/span><\/a><\/div>\n<div class=\"e365-journey__current\"><small>YOU ARE VIEWING<\/small><strong>Challenges<\/strong><\/div>\n<\/div>\n<p><span aria-hidden=\"true\" class=\"e365-journey__progress\"><i><\/i><\/span><\/nav>\n<section aria-labelledby=\"epcc-problem-title\" class=\"energy365-epcc-section energy365-epcc-problem\" data-epcc-chapter=\"problem\" id=\"epcc-problem\">\n<div class=\"energy365-epcc-shell\">\n<header class=\"energy365-epcc-editorial-head energy365-epcc-reveal\">\n<div class=\"energy365-epcc-section-id\"><span aria-hidden=\"true\">01<\/span><small>START WITH THE FACILITY CHALLENGE<\/small><\/div>\n<div>\n<h2 id=\"epcc-problem-title\">Reduce risk from the outset<\/h2>\n<p>An effective project approach starts with the facility\u2019s actual needs and constraints: load profile, roof conditions, grid connection, safety, permitting and construction planning.<\/p>\n<\/div>\n<\/header>\n<div class=\"energy365-epcc-priority-grid\">\n<article class=\"energy365-epcc-priority energy365-epcc-reveal\"><span>01<\/span><\/p>\n<h3>Investment case<\/h3>\n<p>Actual load, roof conditions and expected generation provide the basis for selecting an appropriate capacity and balancing energy benefits with capital investment.<\/p>\n<\/article>\n<article class=\"energy365-epcc-priority energy365-epcc-reveal\"><span>02<\/span><\/p>\n<h3>System safety<\/h3>\n<p>Structural conditions, fire risk, electrical protection and installation quality need to be addressed from the design stage.<\/p>\n<\/article>\n<article class=\"energy365-epcc-priority energy365-epcc-reveal\"><span>03<\/span><\/p>\n<h3>Compliance &amp; approvals<\/h3>\n<p>Applicable procedures, approvals and grid-connection requirements need to be identified early for each project.<\/p>\n<\/article>\n<article class=\"energy365-epcc-priority energy365-epcc-reveal\"><span>04<\/span><\/p>\n<h3>Operational continuity<\/h3>\n<p>Construction methods and schedules need to be coordinated with facility operations to limit disruption to production.<\/p>\n<\/article>\n<\/div>\n<\/div>\n<\/section>\n<section aria-labelledby=\"epcc-scope-title\" class=\"energy365-epcc-section energy365-epcc-scope\" data-epcc-chapter=\"scope\" id=\"epcc-scope\">\n<div class=\"energy365-epcc-shell\">\n<header class=\"energy365-epcc-editorial-head energy365-epcc-reveal\">\n<div class=\"energy365-epcc-section-id\"><span aria-hidden=\"true\">02<\/span><small>06 DELIVERY STAGES<\/small><\/div>\n<div>\n<h2 id=\"epcc-scope-title\">From site assessment to handover<\/h2>\n<p>Six connected stages link project inputs, delivery work and handover outputs. EPCC covers engineering (E), procurement (P), construction (C), and testing and commissioning (C).<\/p>\n<\/div>\n<\/header>\n<div class=\"epcc-chain\" data-epcc-chain=\"\">\n<div class=\"epcc-chain__owner\">\n<div><span>365ENERGY \u00b7 ONE ACCOUNTABLE DELIVERY PARTNER<\/span><\/p>\n<p>Engineering \u00b7 Schedule \u00b7 Quality \u00b7 Facility coordination<\/p>\n<\/div>\n<p><button aria-pressed=\"false\" data-chain-toggle=\"\" type=\"button\"><span data-chain-toggle-label=\"\">Pause autoplay<\/span><b aria-hidden=\"true\">\u2161<\/b><\/button><\/div>\n<div aria-label=\"Select a delivery stage\" class=\"epcc-chain__nav\" role=\"group\">\n<button aria-controls=\"epcc-chain-body-1\" aria-expanded=\"true\" data-chain-select=\"1\" type=\"button\"><b>01<\/b><span>Assessment<\/span><\/button><br \/>\n<button aria-controls=\"epcc-chain-body-2\" aria-expanded=\"false\" data-chain-select=\"2\" type=\"button\"><b>02<\/b><span>Engineering<\/span><\/button><br \/>\n<button aria-controls=\"epcc-chain-body-3\" aria-expanded=\"false\" data-chain-select=\"3\" type=\"button\"><b>03<\/b><span>Approvals<\/span><\/button><br \/>\n<button aria-controls=\"epcc-chain-body-4\" aria-expanded=\"false\" data-chain-select=\"4\" type=\"button\"><b>04<\/b><span>Procurement<\/span><\/button><br \/>\n<button aria-controls=\"epcc-chain-body-5\" aria-expanded=\"false\" data-chain-select=\"5\" type=\"button\"><b>05<\/b><span>Construction<\/span><\/button><br \/>\n<button aria-controls=\"epcc-chain-body-6\" aria-expanded=\"false\" data-chain-select=\"6\" type=\"button\"><b>06<\/b><span>Handover<\/span><\/button>\n<\/div>\n<div class=\"epcc-chain__stages\">\n<details class=\"epcc-chain__stage\" data-chain-stage=\"1\" open=\"\">\n<summary><b>01<\/b><span>Assessment &amp; concept<\/span><i aria-hidden=\"true\">+<\/i><\/summary>\n<div aria-labelledby=\"epcc-chain-title-1\" class=\"epcc-chain__body\" id=\"epcc-chain-body-1\" role=\"region\" tabindex=\"0\">\n<div class=\"epcc-chain__input\"><small>INPUT<\/small><\/p>\n<p>Facility requirements &amp; existing conditions<\/p>\n<\/div>\n<div class=\"epcc-chain__work\"><small>STAGE 01 \/ 06<\/small><\/p>\n<h3 id=\"epcc-chain-title-1\">Assessment &amp; concept<\/h3>\n<p>Assess roof conditions, load profile and operating requirements to establish the basis for a solar PV concept; consider BESS integration where appropriate.<\/p>\n<\/div>\n<div class=\"epcc-chain__output\"><small>STAGE OUTPUT<\/small><strong>Assessment data &amp; concept basis<\/strong><\/p>\n<p>Provides the basis for detailed engineering.<\/p>\n<\/div>\n<\/div>\n<\/details>\n<details class=\"epcc-chain__stage\" data-chain-stage=\"2\">\n<summary><b>02<\/b><span>Detailed engineering<\/span><i aria-hidden=\"true\">+<\/i><\/summary>\n<div aria-labelledby=\"epcc-chain-title-2\" class=\"epcc-chain__body\" id=\"epcc-chain-body-2\" role=\"region\" tabindex=\"0\">\n<div class=\"epcc-chain__input\"><small>INPUT<\/small><\/p>\n<p>Assessment data &amp; concept basis<\/p>\n<\/div>\n<div class=\"epcc-chain__work\"><small>STAGE 02 \/ 06<\/small><\/p>\n<h3 id=\"epcc-chain-title-2\">Detailed engineering<\/h3>\n<p>Analyse shading and structural conditions, and develop the AC\/DC electrical design, protection scheme and safety measures to suit the facility and project scope.<\/p>\n<\/div>\n<div class=\"epcc-chain__output\"><small>STAGE OUTPUT<\/small><strong>Design package &amp; technical requirements<\/strong><\/p>\n<p>Connects approval requirements with equipment selection.<\/p>\n<\/div>\n<\/div>\n<\/details>\n<details class=\"epcc-chain__stage\" data-chain-stage=\"3\">\n<summary><b>03<\/b><span>Permitting &amp; approvals<\/span><i aria-hidden=\"true\">+<\/i><\/summary>\n<div aria-labelledby=\"epcc-chain-title-3\" class=\"epcc-chain__body\" id=\"epcc-chain-body-3\" role=\"region\" tabindex=\"0\">\n<div class=\"epcc-chain__input\"><small>INPUT<\/small><\/p>\n<p>Concept &amp; applicable conditions<\/p>\n<\/div>\n<div class=\"epcc-chain__work\"><small>STAGE 03 \/ 06<\/small><\/p>\n<h3 id=\"epcc-chain-title-3\">Permitting &amp; approvals<\/h3>\n<p>Review applicable grid-connection, construction, fire-safety and environmental procedures; coordinate documentation and project-specific responsibilities among the parties.<\/p>\n<\/div>\n<div class=\"epcc-chain__output\"><small>STAGE OUTPUT<\/small><strong>Delivery conditions &amp; approval requirements<\/strong><\/p>\n<p>Updates the conditions that must be met during delivery.<\/p>\n<\/div>\n<\/div>\n<\/details>\n<details class=\"epcc-chain__stage\" data-chain-stage=\"4\">\n<summary><b>04<\/b><span>Procurement &amp; control<\/span><i aria-hidden=\"true\">+<\/i><\/summary>\n<div aria-labelledby=\"epcc-chain-title-4\" class=\"epcc-chain__body\" id=\"epcc-chain-body-4\" role=\"region\" tabindex=\"0\">\n<div class=\"epcc-chain__input\"><small>INPUT<\/small><\/p>\n<p>Approved design &amp; agreed requirements<\/p>\n<\/div>\n<div class=\"epcc-chain__work\"><small>STAGE 04 \/ 06<\/small><\/p>\n<h3 id=\"epcc-chain-title-4\">Procurement &amp; control<\/h3>\n<p>Select, procure and control equipment and materials against the design; coordinate configuration changes when required.<\/p>\n<\/div>\n<div class=\"epcc-chain__output\"><small>STAGE OUTPUT<\/small><strong>Equipment and materials aligned with design<\/strong><\/p>\n<p>Provides the approved basis and materials for construction.<\/p>\n<\/div>\n<\/div>\n<\/details>\n<details class=\"epcc-chain__stage\" data-chain-stage=\"5\">\n<summary><b>05<\/b><span>Construction &amp; QA\/QC<\/span><i aria-hidden=\"true\">+<\/i><\/summary>\n<div aria-labelledby=\"epcc-chain-title-5\" class=\"epcc-chain__body\" id=\"epcc-chain-body-5\" role=\"region\" tabindex=\"0\">\n<div class=\"epcc-chain__input\"><small>INPUT<\/small><\/p>\n<p>Equipment, design &amp; site conditions<\/p>\n<\/div>\n<div class=\"epcc-chain__work\"><small>STAGE 05 \/ 06<\/small><\/p>\n<h3 id=\"epcc-chain-title-5\">Construction &amp; QA\/QC<\/h3>\n<p>Coordinate work areas and production schedules; manage construction methods, safety, schedule and installation quality checks within the project scope.<\/p>\n<\/div>\n<div class=\"epcc-chain__output\"><small>STAGE OUTPUT<\/small><strong>Installed system &amp; QA\/QC records<\/strong><\/p>\n<p>Provides the basis for testing, commissioning and acceptance.<\/p>\n<\/div>\n<\/div>\n<\/details>\n<details class=\"epcc-chain__stage\" data-chain-stage=\"6\">\n<summary><b>06<\/b><span>Commissioning &amp; handover<\/span><i aria-hidden=\"true\">+<\/i><\/summary>\n<div aria-labelledby=\"epcc-chain-title-6\" class=\"epcc-chain__body\" id=\"epcc-chain-body-6\" role=\"region\" tabindex=\"0\">\n<div class=\"epcc-chain__input\"><small>INPUT<\/small><\/p>\n<p>Installed system &amp; QA\/QC records<\/p>\n<\/div>\n<div class=\"epcc-chain__work\"><small>STAGE 06 \/ 06<\/small><\/p>\n<h3 id=\"epcc-chain-title-6\">Commissioning &amp; handover<\/h3>\n<p>Complete the tests defined in the project scope, together with the required documentation, guidance and training, to support a structured handover to the facility team.<\/p>\n<\/div>\n<div class=\"epcc-chain__output\"><small>STAGE OUTPUT<\/small><strong>Test results &amp; handover documentation<\/strong><\/p>\n<p>Supports the transition to operation under the agreed scope.<\/p>\n<\/div>\n<\/div>\n<\/details>\n<\/div>\n<p class=\"epcc-chain__note\">Stages may overlap or be updated to reflect project conditions. Specific outputs and responsibilities are agreed in the contractual scope.<\/p>\n<\/div>\n<\/div>\n<\/section>\n<section aria-labelledby=\"epcc-control-title\" class=\"energy365-epcc-section energy365-epcc-control\" data-epcc-chapter=\"control\" id=\"epcc-control\">\n<div class=\"energy365-epcc-shell\">\n<header class=\"energy365-epcc-editorial-head energy365-epcc-reveal\">\n<div class=\"energy365-epcc-section-id\"><span aria-hidden=\"true\">03<\/span><small>TECHNICAL REVIEW GATES<\/small><\/div>\n<div>\n<h2 id=\"epcc-control-title\">Quality controls at every stage<\/h2>\n<p>365Energy establishes technical review gates between stages to identify deviations early and limit rework, schedule delays and operational impact.<\/p>\n<\/div>\n<\/header>\n<div class=\"energy365-epcc-control__layout\">\n<div aria-label=\"Project quality review gates\" aria-orientation=\"vertical\" class=\"energy365-epcc-control__rail energy365-epcc-reveal\" role=\"tablist\">\n<button aria-controls=\"epcc-control-panel\" aria-selected=\"true\" data-control=\"design\" id=\"epcc-control-tab-design\" role=\"tab\" tabindex=\"0\" type=\"button\"><b>01<\/b><span>Design review<\/span><\/button><br \/>\n<button aria-controls=\"epcc-control-panel\" aria-selected=\"false\" data-control=\"equipment\" id=\"epcc-control-tab-equipment\" role=\"tab\" tabindex=\"-1\" type=\"button\"><b>02<\/b><span>Equipment control<\/span><\/button><br \/>\n<button aria-controls=\"epcc-control-panel\" aria-selected=\"false\" data-control=\"qa\" id=\"epcc-control-tab-qa\" role=\"tab\" tabindex=\"-1\" type=\"button\"><b>03<\/b><span>Site QA\/QC<\/span><\/button><br \/>\n<button aria-controls=\"epcc-control-panel\" aria-selected=\"false\" data-control=\"testing\" id=\"epcc-control-tab-testing\" role=\"tab\" tabindex=\"-1\" type=\"button\"><b>04<\/b><span>Testing &amp; commissioning<\/span><\/button><br \/>\n<button aria-controls=\"epcc-control-panel\" aria-selected=\"false\" data-control=\"handover\" id=\"epcc-control-tab-handover\" role=\"tab\" tabindex=\"-1\" type=\"button\"><b>05<\/b><span>Documentation &amp; handover<\/span><\/button>\n<\/div>\n<div aria-labelledby=\"epcc-control-tab-design\" class=\"energy365-epcc-control__panel energy365-epcc-reveal\" data-control-panel=\"\" id=\"epcc-control-panel\" role=\"tabpanel\" tabindex=\"0\">\n<div class=\"energy365-epcc-control__copy\"><span data-control-kicker=\"\">ENGINEERING<\/span><\/p>\n<h3 data-control-title=\"\">Design review<\/h3>\n<p data-control-copy=\"\">Review capacity, shading, structural conditions, cable routes, protection and earthing before procurement to limit design changes once delivery has started.<\/p>\n<\/div>\n<figure class=\"energy365-epcc-control__evidence\"><img alt=\"Illustration of an engineer reviewing detailed engineering drawings\" data-control-image=\"\" decoding=\"async\" height=\"520\" loading=\"lazy\" src=\"\/wp-content\/themes\/flatsome-child\/assets\/365e-unified\/epcc\/images\/evidence-design-365e.webp\" width=\"800\" title=\"\"><figcaption data-control-caption=\"\">Process illustration: detailed engineering review<\/figcaption><\/figure>\n<\/div>\n<\/div>\n<div aria-label=\"Project quality review gates on mobile\" class=\"energy365-epcc-control__mobile energy365-epcc-reveal\">\n<details class=\"energy365-epcc-accordion\" data-accordion-group=\"control-mobile\" open=\"\">\n<summary><b>01<\/b><span>Design review<\/span><\/summary>\n<div class=\"energy365-epcc-accordion__body\"><small>ENGINEERING<\/small><\/p>\n<p>Review capacity, shading, structural conditions, cable routes, protection and earthing before procurement to limit design changes once delivery has started.<\/p>\n<figure class=\"energy365-epcc-control__mobile-evidence\"><img alt=\"Illustration of an engineer reviewing detailed engineering drawings\" decoding=\"async\" height=\"520\" loading=\"lazy\" src=\"\/wp-content\/themes\/flatsome-child\/assets\/365e-unified\/epcc\/images\/evidence-design-365e.webp\" width=\"800\" title=\"\"><figcaption>Process illustration: detailed engineering review<\/figcaption><\/figure>\n<\/div>\n<\/details>\n<details class=\"energy365-epcc-accordion\" data-accordion-group=\"control-mobile\">\n<summary><b>02<\/b><span>Equipment control<\/span><\/summary>\n<div class=\"energy365-epcc-accordion__body\"><small>EQUIPMENT<\/small><\/p>\n<p>Review equipment quality, certification, configuration and compatibility with the approved design to limit configuration errors or material changes during delivery.<\/p>\n<figure class=\"energy365-epcc-control__mobile-evidence\"><img alt=\"Engineers installing a rooftop solar PV system\" class=\"energy365-epcc-lazy-evidence\" data-src=\"\/wp-content\/themes\/flatsome-child\/assets\/365e-unified\/epcc\/images\/Thicong.jpg\" decoding=\"async\" height=\"577\" loading=\"lazy\" src=\"\/wp-content\/themes\/flatsome-child\/assets\/365e-unified\/epcc\/images\/Thicong.jpg\" width=\"1024\" title=\"\"><figcaption>Equipment and installation quality checks on site<\/figcaption><\/figure>\n<\/div>\n<\/details>\n<details class=\"energy365-epcc-accordion\" data-accordion-group=\"control-mobile\">\n<summary><b>03<\/b><span>Site QA\/QC<\/span><\/summary>\n<div class=\"energy365-epcc-accordion__body\"><small>HSE &amp; QA\/QC<\/small><\/p>\n<p>Check connections, torque, polarity, installation quality and project-specific QA\/QC points to identify issues before they become operational faults.<\/p>\n<figure class=\"energy365-epcc-control__mobile-evidence\"><img alt=\"Illustration of on-site solar PV QA\/QC\" class=\"energy365-epcc-lazy-evidence\" data-src=\"\/wp-content\/themes\/flatsome-child\/assets\/365e-unified\/epcc\/images\/evidence-qa-365e.webp\" decoding=\"async\" height=\"520\" loading=\"lazy\" src=\"\/wp-content\/themes\/flatsome-child\/assets\/365e-unified\/epcc\/images\/evidence-qa-365e.webp\" width=\"800\" title=\"\"><figcaption>Process illustration: site QA\/QC<\/figcaption><\/figure>\n<\/div>\n<\/details>\n<details class=\"energy365-epcc-accordion\" data-accordion-group=\"control-mobile\">\n<summary><b>04<\/b><span>Testing &amp; commissioning<\/span><\/summary>\n<div class=\"energy365-epcc-accordion__body\"><small>TESTING &amp; COMMISSIONING<\/small><\/p>\n<p>Perform insulation-resistance, I\u2013V curve, thermal and protection-device functional tests, together with other tests defined in the project scope, before the system enters operation.<\/p>\n<figure class=\"energy365-epcc-control__mobile-evidence\"><img alt=\"365Energy engineer assessing the electrical system on site\" class=\"energy365-epcc-lazy-evidence\" data-src=\"\/wp-content\/themes\/flatsome-child\/assets\/365e-unified\/epcc\/images\/Assessment.jpg\" decoding=\"async\" height=\"300\" loading=\"lazy\" src=\"\/wp-content\/themes\/flatsome-child\/assets\/365e-unified\/epcc\/images\/Assessment.jpg\" width=\"400\" title=\"\"><figcaption>Technical assessment on site<\/figcaption><\/figure>\n<\/div>\n<\/details>\n<details class=\"energy365-epcc-accordion\" data-accordion-group=\"control-mobile\">\n<summary><b>05<\/b><span>Documentation &amp; handover<\/span><\/summary>\n<div class=\"energy365-epcc-accordion__body\"><small>HANDOVER<\/small><\/p>\n<p>Complete documentation, test reports, guidance and training so the operations team receives the technical information needed to take over the system.<\/p>\n<figure class=\"energy365-epcc-control__mobile-evidence\"><img alt=\"Engineer reviewing solar PV system data on a mobile device\" class=\"energy365-epcc-lazy-evidence\" data-src=\"\/wp-content\/themes\/flatsome-child\/assets\/365e-unified\/epcc\/images\/bangiao.jpg\" decoding=\"async\" height=\"800\" loading=\"lazy\" src=\"\/wp-content\/themes\/flatsome-child\/assets\/365e-unified\/epcc\/images\/bangiao.jpg\" width=\"1440\" title=\"\"><figcaption>Guidance on system-data monitoring during handover<\/figcaption><\/figure>\n<\/div>\n<\/details>\n<\/div>\n<\/div>\n<\/section>\n<section aria-labelledby=\"epcc-risk-title\" class=\"energy365-epcc-section energy365-epcc-risk\" data-epcc-chapter=\"risk\" id=\"epcc-risk\">\n<div class=\"energy365-epcc-shell\">\n<header class=\"energy365-epcc-editorial-head energy365-epcc-reveal\">\n<div class=\"energy365-epcc-section-id\"><span aria-hidden=\"true\">04<\/span><small>PRE-DELIVERY REVIEW<\/small><\/div>\n<div>\n<h2 id=\"epcc-risk-title\">Identify risks early<\/h2>\n<p>Material risks need to be identified before they lead to design changes, schedule delays or disruption to facility operations.<\/p>\n<\/div>\n<\/header>\n<div class=\"energy365-epcc-risk__grid\">\n<div class=\"energy365-epcc-risk__list energy365-epcc-reveal\" data-risk-list=\"\">\n<button aria-controls=\"epcc-risk-panel\" aria-pressed=\"true\" class=\"is-active\" data-risk=\"roof\" id=\"epcc-risk-btn-roof\" type=\"button\"><span>Roof structure<\/span><small>Project-specific review required<\/small><b>\u2192<\/b><\/button><br \/>\n<button aria-controls=\"epcc-risk-panel\" aria-pressed=\"false\" data-risk=\"fire\" id=\"epcc-risk-btn-fire\" type=\"button\"><span>Fire risk<\/span><small>Project-specific review required<\/small><b>\u2192<\/b><\/button><br \/>\n<button aria-controls=\"epcc-risk-panel\" aria-pressed=\"false\" data-risk=\"permit\" id=\"epcc-risk-btn-permit\" type=\"button\"><span>Approval delays<\/span><small>Project-specific review required<\/small><b>\u2192<\/b><\/button><br \/>\n<button aria-controls=\"epcc-risk-panel\" aria-pressed=\"false\" data-risk=\"factory\" id=\"epcc-risk-btn-factory\" type=\"button\"><span>Production disruption<\/span><small>Project-specific review required<\/small><b>\u2192<\/b><\/button><br \/>\n<button aria-controls=\"epcc-risk-panel\" aria-pressed=\"false\" data-risk=\"performance\" id=\"epcc-risk-btn-performance\" type=\"button\"><span>System performance<\/span><small>Project-specific review required<\/small><b>\u2192<\/b><\/button><br \/>\n<button aria-controls=\"epcc-risk-panel\" aria-pressed=\"false\" data-risk=\"responsibility\" id=\"epcc-risk-btn-responsibility\" type=\"button\"><span>Responsibility gaps<\/span><small>Project-specific review required<\/small><b>\u2192<\/b><\/button>\n<\/div>\n<aside aria-live=\"polite\" class=\"energy365-epcc-risk__panel energy365-epcc-reveal\" data-risk-panel=\"\" id=\"epcc-risk-panel\">\n<div class=\"energy365-epcc-risk__panel-top\"><span>SELECTED RISK<\/span><b data-risk-level=\"\">PROJECT-SPECIFIC<\/b><\/div>\n<h3 data-risk-title=\"\">Roof structure<\/h3>\n<p data-risk-summary=\"\">An inadequately assessed roof structure can affect safety and lead to design changes. 365Energy reviews structural conditions and arranges an independent assessment where needed before finalising the implementation approach.<\/p>\n<\/aside>\n<\/div>\n<div aria-label=\"Project risks on mobile\" class=\"energy365-epcc-risk__mobile energy365-epcc-reveal\">\n<details class=\"energy365-epcc-risk-accordion\" data-accordion-group=\"risk-mobile\" open=\"\">\n<summary><span><strong>Roof structure<\/strong><small>Project-specific review required<\/small><\/span><\/summary>\n<div class=\"energy365-epcc-risk-accordion__body\">\n<p>An inadequately assessed roof structure can affect safety and lead to design changes. 365Energy reviews structural conditions and arranges an independent assessment where needed before finalising the implementation approach.<\/p>\n<\/div>\n<\/details>\n<details class=\"energy365-epcc-risk-accordion\" data-accordion-group=\"risk-mobile\">\n<summary><span><strong>Fire risk<\/strong><small>Project-specific review required<\/small><\/span><\/summary>\n<div class=\"energy365-epcc-risk-accordion__body\">\n<p>Fire risk can directly affect people, assets and insurance requirements. 365Energy incorporates preventive measures from design and equipment selection through QA\/QC, testing and operation.<\/p>\n<\/div>\n<\/details>\n<details class=\"energy365-epcc-risk-accordion\" data-accordion-group=\"risk-mobile\">\n<summary><span><strong>Approval delays<\/strong><small>Project-specific review required<\/small><\/span><\/summary>\n<div class=\"energy365-epcc-risk-accordion__body\">\n<p>Unclear permitting requirements or approval pathways can affect the schedule. 365Energy reviews applicable requirements and the coordination path before committing to delivery.<\/p>\n<\/div>\n<\/details>\n<details class=\"energy365-epcc-risk-accordion\" data-accordion-group=\"risk-mobile\">\n<summary><span><strong>Production disruption<\/strong><small>Project-specific review required<\/small><\/span><\/summary>\n<div class=\"energy365-epcc-risk-accordion__body\">\n<p>Work areas, transport routes and shutdown requirements are reviewed with the facility, with safety measures and the delivery schedule agreed before construction.<\/p>\n<\/div>\n<\/details>\n<details class=\"energy365-epcc-risk-accordion\" data-accordion-group=\"risk-mobile\">\n<summary><span><strong>System performance<\/strong><small>Project-specific review required<\/small><\/span><\/summary>\n<div class=\"energy365-epcc-risk-accordion__body\">\n<p>Actual generation may differ from expectations. 365Energy uses PVsyst, monitoring and an operations and maintenance plan to track generation and performance.<\/p>\n<\/div>\n<\/details>\n<details class=\"energy365-epcc-risk-accordion\" data-accordion-group=\"risk-mobile\">\n<summary><span><strong>Responsibility gaps<\/strong><small>Project-specific review required<\/small><\/span><\/summary>\n<div class=\"energy365-epcc-risk-accordion__body\">\n<p>Unclear responsibilities can delay decisions or create disputes. 365Energy establishes a responsibility matrix and reporting and escalation arrangements from the start of the project.<\/p>\n<\/div>\n<\/details>\n<\/div>\n<\/div>\n<\/section>\n<section aria-labelledby=\"epcc-capability-title\" class=\"energy365-epcc-section energy365-epcc-capability\" data-epcc-chapter=\"capability\" id=\"epcc-capability\">\n<div class=\"energy365-epcc-shell\">\n<header class=\"energy365-epcc-editorial-head energy365-epcc-reveal\">\n<div class=\"energy365-epcc-section-id\"><span aria-hidden=\"true\">05<\/span><small>DELIVERY CAPABILITY<\/small><\/div>\n<div>\n<h2 id=\"epcc-capability-title\">In-house delivery capability<\/h2>\n<\/div>\n<\/header>\n<div class=\"energy365-epcc-capability__workforce energy365-epcc-reveal\">\n<div class=\"energy365-epcc-capability__total\"><strong>70+<\/strong><\/p>\n<div><span>In-house workforce<\/span><small>Six functional teams connected across the project lifecycle<\/small><\/div>\n<\/div>\n<div aria-label=\"Six in-house functional teams\" class=\"energy365-epcc-capability__roles\">\n<div><strong>09<\/strong><span>Business development<\/span><small>Project &amp; client development<\/small><\/div>\n<div><strong>05<\/strong><span>Permitting &amp; compliance<\/span><small>Permitting &amp; compliance coordination<\/small><\/div>\n<div><strong>14<\/strong><span>Engineering &amp; design<\/span><small>Electrical, structural &amp; detailed engineering<\/small><\/div>\n<div><strong>23+<\/strong><span>Project management<\/span><small>Delivery, HSE, QA\/QC &amp; procurement<\/small><\/div>\n<div><strong>12<\/strong><span>Operations &amp; asset management<\/span><small>Monitoring, maintenance &amp; performance<\/small><\/div>\n<div><strong>07<\/strong><span>Finance &amp; administration<\/span><small>Finance &amp; operational support<\/small><\/div>\n<\/div>\n<p class=\"e365-source-note epcc-workforce-source\">Workforce structure based on the 2026 company profile. Participating teams and specific responsibilities are defined for each project.<\/p>\n<\/div>\n<div class=\"energy365-epcc-standard energy365-epcc-reveal\">\n<div class=\"energy365-epcc-standard__copy\"><span>REQUIREMENT-BASED CONFIGURATION<\/span><\/p>\n<h3>Project configuration framework<\/h3>\n<p>The technical configuration is defined by facility conditions, client requirements, applicable regulations and insurer standards where relevant.<\/p>\n<p class=\"energy365-epcc-standard__note\">Configuration levels are defined for each project and are not fixed standard packages.<\/p>\n<\/div>\n<div aria-label=\"Technical configuration levels based on project requirements\" class=\"energy365-epcc-standard__levels\" data-epcc-line-reveal=\"\">\n<div class=\"energy365-epcc-standard__level\" data-level=\"1\"><b>01<\/b><strong>Vietnamese regulatory requirements<\/strong><small>Compliance baseline<\/small><\/div>\n<div class=\"energy365-epcc-standard__level\" data-level=\"2\"><b>02<\/b><strong>Enhanced industrial standards<\/strong><small>Enhanced reliability<\/small><\/div>\n<div class=\"energy365-epcc-standard__level\" data-level=\"3\"><b>03<\/b><strong>FM Global-aligned approach<\/strong><small>Subject to insurer requirements<\/small><\/div>\n<div class=\"energy365-epcc-standard__level\" data-level=\"4\"><b>04<\/b><strong>Tailored safety configuration<\/strong><small>Project-specific requirements<\/small><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/section>\n<section aria-labelledby=\"epcc-projects-title\" class=\"energy365-epcc-section energy365-epcc-projects\" data-epcc-chapter=\"projects\" id=\"epcc-projects\">\n<div class=\"energy365-epcc-shell\">\n<header class=\"energy365-epcc-editorial-head energy365-epcc-reveal\">\n<div class=\"energy365-epcc-section-id\"><span aria-hidden=\"true\">06<\/span><small>PROJECT REFERENCES<\/small><\/div>\n<div>\n<h2 id=\"epcc-projects-title\">Delivery experience<\/h2>\n<p>Selected references illustrate how 365Energy adapts its delivery approach to different project conditions, including high wind loads, enhanced safety requirements and energy storage integration.<\/p>\n<\/div>\n<\/header>\n<article class=\"e365-featured-case\">\n<div class=\"e365-featured-case__intro\"><span>PROJECT REFERENCES<\/span><\/p>\n<h3>Delivery under high-wind conditions<\/h3>\n<p>Universal Alloy Corporation Vietnam<\/p>\n<\/div>\n<figure class=\"e365-featured-case__media\"><img decoding=\"async\" alt=\"Universal Alloy Corporation Vietnam project\" height=\"787\" loading=\"lazy\" src=\"\/wp-content\/themes\/flatsome-child\/assets\/365e-unified\/epcc\/images\/project-uac.webp\" width=\"1400\" title=\"\"><\/figure>\n<div class=\"e365-featured-case__metrics\">\n<div><strong>PV<\/strong><small>Rooftop solar PV<\/small><\/div>\n<div><strong>EPC<\/strong><span><\/span><small>Scope<\/small><\/div>\n<\/div>\n<div class=\"e365-featured-case__story\">\n<div><span>PROJECT REQUIREMENT<\/span><\/p>\n<p>High-wind conditions in Da Nang required structural and schedule controls.<\/p>\n<\/div>\n<div><span>DELIVERY SCOPE<\/span><\/p>\n<p>EPC delivery of a rooftop solar PV system.<\/p>\n<\/div>\n<div><span>CAPABILITY DEMONSTRATED<\/span><\/p>\n<p>Coordinated structural design, construction and schedule management to suit the project conditions.<\/p>\n<\/div>\n<\/div>\n<details class=\"e365-case-detail\">\n<summary>View equipment detail<\/summary>\n<p><img decoding=\"async\" alt=\"Equipment detail at Universal Alloy Corporation Vietnam\" height=\"480\" loading=\"lazy\" src=\"\/wp-content\/themes\/flatsome-child\/assets\/365e-unified\/epcc\/images\/project-uac-detail.webp\" width=\"720\" title=\"\"><\/details>\n<\/article>\n<div class=\"e365-case-index\" data-e365-cases=\"\">\n<div class=\"e365-case-rows\"><button aria-controls=\"e365-case-preview\" aria-pressed=\"true\" class=\"e365-case-row\" data-e365-case=\"vivo\" data-image=\"\/wp-content\/themes\/flatsome-child\/assets\/365e-unified\/epcc\/images\/project-vivocity.webp\" data-label=\"ENHANCED SAFETY REQUIREMENTS\" data-meta=\"754.35 kWp \u00b7 Solar PV\" data-title=\"SC VivoCity\" type=\"button\"><b aria-hidden=\"true\">01<\/b><span class=\"e365-case-row__identity\"><span>ENHANCED SAFETY REQUIREMENTS<\/span><strong>SC VivoCity<\/strong><\/span><span class=\"e365-case-row__meta\">754.35 kWp \u00b7 Solar PV<small>EPC \u00b7 DC optimisers \u00b7 Rapid shutdown \u00b7 FM Global-aligned approach<\/small><\/span><span aria-hidden=\"true\" class=\"e365-case-row__arrow\">\u2192<\/span><\/button><button aria-controls=\"e365-case-preview\" aria-pressed=\"false\" class=\"e365-case-row\" data-e365-case=\"motul\" data-image=\"\/wp-content\/themes\/flatsome-child\/assets\/365e-unified\/epcc\/images\/project-motul.webp\" data-label=\"SOLAR PV + BESS INTEGRATION\" data-meta=\"284.35 kWp + 215 kWh\" data-title=\"Vilube - Motul Vietnam\" type=\"button\"><b aria-hidden=\"true\">02<\/b><span class=\"e365-case-row__identity\"><span>SOLAR PV + BESS INTEGRATION<\/span><strong>Vilube &#8211; Motul Vietnam<\/strong><\/span><span class=\"e365-case-row__meta\">284.35 kWp + 215 kWh<small>EPC \u00b7 Energy storage integration<\/small><\/span><span aria-hidden=\"true\" class=\"e365-case-row__arrow\">\u2192<\/span><\/button><\/div>\n<figure aria-live=\"polite\" class=\"e365-case-preview\" id=\"e365-case-preview\"><img decoding=\"async\" alt=\"SC VivoCity project\" height=\"900\" loading=\"lazy\" src=\"\/wp-content\/themes\/flatsome-child\/assets\/365e-unified\/epcc\/images\/project-vivocity.webp\" width=\"1400\" title=\"\"><figcaption><span>ENHANCED SAFETY REQUIREMENTS<\/span><strong>SC VivoCity<\/strong><small>754.35 kWp \u00b7 Solar PV<\/small><\/figcaption><\/figure>\n<\/div>\n<p><a class=\"e365-project-link\" href=\"\/en\/projects\/\">View project references <span aria-hidden=\"true\">\u2192<\/span><\/a><\/p>\n<div class=\"e365-next-links\"><a data-e365-route=\"BESS\" href=\"https:\/\/365energy.vn\/en\/bess-solutions\/\">Explore BESS integration<span aria-hidden=\"true\">\u2192<\/span><\/a><a data-e365-route=\"About us\" href=\"\/en\/about-us\/\">Learn about 365Energy<span aria-hidden=\"true\">\u2192<\/span><\/a><\/div>\n<\/div>\n<\/section>\n<section aria-labelledby=\"epcc-faq-title\" class=\"energy365-epcc-section energy365-epcc-faq\" data-epcc-chapter=\"faq\" id=\"epcc-faq\">\n<div class=\"energy365-epcc-shell\">\n<header class=\"energy365-epcc-editorial-head energy365-epcc-reveal\">\n<div class=\"energy365-epcc-section-id\"><span aria-hidden=\"true\">07<\/span><small>QUICK ANSWERS<\/small><\/div>\n<div>\n<h2 id=\"epcc-faq-title\">Frequently asked questions<\/h2>\n<p>Key points to clarify before delivering solar PV at an industrial facility.<\/p>\n<\/div>\n<\/header>\n<div class=\"energy365-epcc-faq__list energy365-epcc-reveal\">\n<details open=\"\">\n<summary>What does EPCC include?<span aria-hidden=\"true\">+<\/span><\/summary>\n<div>\n<p>EPC covers <strong>engineering, procurement<\/strong> and <strong>construction<\/strong>. In EPCC, <strong>commissioning<\/strong> is explicitly included in the delivery scope. The scope of work, responsibilities and exclusions are defined for each project and contract.<\/p>\n<\/div>\n<\/details>\n<details>\n<summary>What information is needed initially?<span aria-hidden=\"true\">+<\/span><\/summary>\n<div>\n<p>Start with what the facility already knows: its project objectives, location, shift patterns and relevant operating conditions. If available, electricity bills, <a href=\"https:\/\/365energy.vn\/en\/industrial-load-profile-analysis\/\">load profiles<\/a>, electrical single-line diagrams and roof drawings help the engineering team assess the project more quickly. Any missing data can be added during the site assessment.<\/p>\n<\/div>\n<\/details>\n<details>\n<summary>What does the delivery process involve?<span aria-hidden=\"true\">+<\/span><\/summary>\n<div>\n<p>The process usually starts by clarifying requirements, assessing the site and developing a concept, followed by engineering, procurement, construction, testing and commissioning, then handover. Technical outputs are reviewed at each stage to limit deviations and changes during delivery.<\/p>\n<\/div>\n<\/details>\n<details>\n<summary>Who coordinates permits and approvals?<span aria-hidden=\"true\">+<\/span><\/summary>\n<div>\n<p>Responsibilities for documentation, procedures and approvals are defined for each project. 365Energy can coordinate requirements within its service scope, while the project owner, facility and other relevant parties fulfil obligations that fall within their responsibility or authority.<\/p>\n<\/div>\n<\/details>\n<details>\n<summary>Will construction affect production?<span aria-hidden=\"true\">+<\/span><\/summary>\n<div>\n<p>It can, particularly during equipment transport, work in operational areas or electrical connection activities. Safety measures, the construction schedule and any required power interruptions are coordinated with the facility to reflect actual project conditions.<\/p>\n<\/div>\n<\/details>\n<details>\n<summary>When are the cost and schedule finalised?<span aria-hidden=\"true\">+<\/span><\/summary>\n<div>\n<p>An initial estimate can be prepared from basic data. Cost and schedule can be defined more accurately once site conditions, technical configuration, scope of work and delivery requirements are clarified; subsequent changes are assessed based on their actual impact.<\/p>\n<\/div>\n<\/details>\n<details>\n<summary>What is included at handover?<span aria-hidden=\"true\">+<\/span><\/summary>\n<div>\n<p>Depending on the project scope, handover may include technical documentation, testing and commissioning results, and operational guidance. Warranty obligations and the O&amp;M scope are defined in the contract; long-term O&amp;M is not automatically included in every EPC or EPCC package.<\/p>\n<\/div>\n<\/details>\n<\/div>\n<\/div>\n<\/section>\n<section aria-labelledby=\"epcc-cta-title\" class=\"energy365-epcc-cta\">\n<div class=\"energy365-epcc-shell\">\n<div class=\"energy365-epcc-cta__copy energy365-epcc-reveal\">\n<span>NEXT STEP<\/span><\/p>\n<h2 id=\"epcc-cta-title\">Discuss your project requirements<\/h2>\n<p>Share your facility requirements and available project information so 365Energy can define the initial assessment approach. Electricity bills, load profiles and roof documentation can be provided when available.<\/p>\n<p><a class=\"energy365-epcc-btn energy365-epcc-btn--light\" data-e365-cta=\"consultation\" data-epcc-event=\"epcc_data_cta_click\" href=\"https:\/\/365energy.vn\/en\/contact\/?solution=epcc\">Request a technical consultation \u2192<\/a>\n<\/div>\n<div aria-label=\"Next step\" class=\"energy365-epcc-cta__flow energy365-epcc-reveal\">\n<div><span>01<\/span><strong>Discuss requirements<\/strong><\/div>\n<div><span>02<\/span><strong>Technical assessment<\/strong><\/div>\n<div><span>03<\/span><strong>Develop the concept<\/strong><\/div>\n<\/div>\n<\/div>\n<\/section>\n<p><script type=\"application\/ld+json\">\n{\n  \"@context\": \"https:\/\/schema.org\",\n  \"@type\": \"Service\",\n  \"@id\": \"https:\/\/365energy.vn\/en\/epcc-contractor\/#service\",\n  \"name\": \"Industrial Solar EPCC\",\n  \"serviceType\": \"Engineering, Procurement, Construction & Commissioning for industrial solar PV\",\n  \"description\": \"365Energy connects site assessment, engineering, procurement, construction, commissioning and handover for industrial solar PV under a project-specific scope.\",\n  \"provider\": {\n    \"@type\": \"Organization\",\n    \"name\": \"365Energy\",\n    \"url\": \"https:\/\/365energy.vn\/\"\n  },\n  \"areaServed\": {\n    \"@type\": \"Country\",\n    \"name\": \"Vietnam\"\n  },\n  \"inLanguage\": \"en\"\n}\n<\/script><br \/>\n<noscript data-e365-fallback=\"\"><\/p>\n<style>.energy365-epcc .energy365-epcc-control__mobile,.energy365-epcc .energy365-epcc-risk__mobile{display:block}.energy365-epcc .energy365-epcc-control__layout,.energy365-epcc .energy365-epcc-risk__grid{display:none}<\/style>\n<p><\/noscript><\/main><\/p>\n","protected":false},"excerpt":{"rendered":"<p>TECHNICAL DELIVERY \u00b7 EPCC Industrial Solar EPCC One accountable delivery partner connects site assessment, engineering, procurement, construction and commissioning, helping&#8230;<\/p>\n","protected":false},"author":5,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"page-blank.php","meta":{"inline_featured_image":false,"footnotes":""},"class_list":["post-11717","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/365energy.vn\/en\/wp-json\/wp\/v2\/pages\/11717","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/365energy.vn\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/365energy.vn\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/365energy.vn\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/365energy.vn\/en\/wp-json\/wp\/v2\/comments?post=11717"}],"version-history":[{"count":20,"href":"https:\/\/365energy.vn\/en\/wp-json\/wp\/v2\/pages\/11717\/revisions"}],"predecessor-version":[{"id":13281,"href":"https:\/\/365energy.vn\/en\/wp-json\/wp\/v2\/pages\/11717\/revisions\/13281"}],"wp:attachment":[{"href":"https:\/\/365energy.vn\/en\/wp-json\/wp\/v2\/media?parent=11717"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}