Contact us

23.4 kWp
Total capacityTons/year
Reduced CO2 emissionsTime: 2019
Location: 199 Nguyen Van Huong, Thao Dien Ward, District 2, HCMC
The olar power system 23.4 kWp of Mr. Vu’s household in Thao Dien Ward, District 2, Ho Chi Minh City, was constructed and installed by 365 Energy. The system comes into operation to help generate electricity output of 34,164 kWh/year for household activities. At the same time, by using solar power, Mr. Vu’s family contributes to environmental protection.