2,500 kWp

Total capacity

3,372 Tons/year

Reduced CO2 emissions
Client

Sai Gon Kien Giang Beer Factory

  • icon

    Time: 11/2020 - 12/2020

  • icon

    Location: D1 D1 Thanh Loc Industrial Park, Thanh Loc Wards, Chau Thanh District, Kien Giang Province

  • Implementation of a 2.5 MWP solar power project at the Saigon Kien Giang brewery using the ESCO model

    The Saigon – Kien Giang Brewery Solar Power Project was completed in December 2020 and deployed under the ESCO model, in which businesses will take advantage of the existing factory roof with zero investment cost and pay less for electricity compared to the price of electricity from EVN grid.

    The project, which uses cutting-edge technology, is equipped with 6,084 JA 410 W solar panels for high conversion efficiency and light absorption. In addition, the project has used a 100 KW grid-tied inverter converter from Huawei, which has many outstanding technologies that will help the system operate more reliably, increase output, and meet the national grid connection standards.

    • Installed capacity: 2.5 MWP
    • Power output: 3.832 kWh
    • Reduce CO2: 3372 tons/ year

    With practical experience as well as to ease the operation and monitoring process, 365 Energy has consulted and used a remote monitoring management system through an application on a mobile phone device for the project. At the same time, in order to reduce the risk of damage caused by weather problems such as rain, wind, storm, etc. The project is also equipped with a weather monitoring system to forecast bad situations in advance which directly affect solar panels.