150 000 kWp
Total capacity219 000 Tons/year
Reduced CO2 emissionsTime: 06/2019
Location: Dau Tieng, Duong Minh Chau district and Tan Chau district, Tay Ninh province.
The Dau Tieng 1 Solar Energy Plant Project, with a capacity of 150 MWP and a land use area of approximately 216 ha, is located in the Dau Tieng Lake area, Duong Minh Chau district, and Tan Chau district. The total investment capital is close to 4,000 billion VND.
Green Electric is one of the construction and installation units for the Dau Tieng 1 Lake – Tay Ninh solar energy project.