4.3 MWP SOLAR POWER PROJECT – UACV FACTORY
4304
Total capacity4,802.3
Reduced CO2 emissionsUACV (Universal Alloy Corporation Vietnam) FACTORY
UACV (Universal Alloy Corporation Vietnam) Factory, located at Street 4, Lot A9, Da Nang Hi-Tech Park, Da Nang, Vietnam
Implementing the project at UACV factory
The solar power project at the UACV (Universal Alloy Corporation Vietnam) factory was started on December 16, 2022 with 365 Energy as the General Contractor:
- Installed capacity: 4304 kWp
- Electricity output: 5,906.91 kWh/year
The system’s conversion efficiency is stable thanks to the use of 7172 Cadian Solar panels and 29 125kW Sungrow inverter ensuring high conversion capacity.
The system is designed and built to meet the highest standards for an area affected every year by major storms. With 7,172 installed modules, the system will generate 5,906.91 MWh and reduce 4,802.3 tons of CO2 annually, helping UACV offset 27% of current electricity consumption needs. The above numbers are proof of the factory’s efforts to green production.