Contact us

51.5 kWp
Total capacity108.04 Tons/year
Reduced CO2 emissionsTime: 12/01/2018
Location: 60A Hoang Van Thu, Ward 9, Phu Nhuan district, HCMC
Solar energy system 51.5 kWp – Tuoi Tre, HCMC is constructed and installed by Green Electric. The system comes into operation to help generate electricity output of 74.160 kwh/year for domestic activities. At the same time, the company has reduced 10,931 tons of CO2 annually, joining hands to protect the environment.